Practise in the Hall
Continuing the Oct 20th story :
Tiring and dissapointing day. It was a regret that we unexpectedly lost some props. THAT incident completed our team "life cycle"...we have had good times and hard times.
Lucky there was long holidays.
The badminton hall that we use to practise was not fully equipped.
Jamal lend his own speaker system to the team. (last photo)
Anyway, we did a few full runs, improved our eye contact (until someone hit the video tripod), recorded some runs, watched our own show and made corrections.
For this practise , we had improved LOI (picture #3 from top), and decided to replace the colorful "week indicator" due to low impact.
And the "salesman" couldn't join on time. So we had the "China Engineer" to replace the salesman temporarily (picture #3 and #4 from top). (He did OK although he was actually thinking about the internal auditors' findings)
Some of the toughest scene this time were production scene and the ending itself...showing the savings cards, the bow, and self introduction.
* We received flight tickets on Oct 20th.Hooray*
0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home